Loading…

Reliance Bangladesh LNG & Power awarded GE a contract to provide gas turbine technology for a new 718 MW combined cycle power plant in Meghnaghat, Bangladesh. The plant will use two GE 9F gas turbines and is due to be operational in 2022.
“The upgrade solution will help in delivering up to 6.7% increase in power output, up to 3.3 % improvement in heat rate, up to 2% increase in efficiency.”tbsnews.net
Summarized from public sources; check the original articles before acting on it.