MHPS receives order from Baotou Steel for two GTCC power generating units
Mitsubishi Hitachi Power Systems (MHPS) received an order from Baotou Iron and Steel Group for two blast furnace gas-fired 165 MW class GTCC generating units, with shipments planned to begin in 2021.
Capacity
330 MW (2 x 165 MW)
Productsblast furnace gas-fired GTCC generating unitsM701S (DA) X series gas turbines
“MHPS has received an order from Chinese firm Baotou Iron and Steel Group (Baotou Steel Group) for two blast furnace gas (BFG)-fired 165 megawatt (MW) class gas turbine combined cycle (GTCC) generating units.”nasdaq.com
- 2 sources
- nasdaq.comMHPS Receives Order from China's Baotou Steel for Two Blast Furnace Gas-fired Gas Turbine Combined Cycle (GTCC) Power Generating Units | NasdaqApr 13, 2020
- power.mhi.comMHPS Receives Order from China's Baotou Steel for Two Blast Furnace Gas-fired Gas Turbine Combined Cycle (GTCC) Power Generating Units | Mitsubishi PowerApr 14, 2020
Summarized from public sources; check the original articles before acting on it.