Loading…

Mitsubishi Hitachi Power Systems (MHPS) has received an order from Baotou Iron and Steel Group for two 165 MW blast furnace gas-fired gas turbine combined cycle generating units. Shipments to China are planned to begin in 2021.
“This is the third expansion project for Baotou Steel Group since 2005; shipments to China are planned to begin in 2021.”acnnewswire.com
Summarized from public sources; check the original articles before acting on it.