Loading…

MAN Energy Solutions has won an order to supply five MAN 51/60DF dual-fuel main engines for Tallink Grupp's new shuttle ferry MyStar, to be built by Rauma Marine Constructions. Delivery is scheduled for early 2022.
“The engines performed strongly on the testbed, showcasing such characteristic advantages as load behavior and pure gas start, which ultimately led Tallink to choose MAN.”offshore-energy.biz
Summarized from public sources; check the original articles before acting on it.