Industrial Machineryworld trade 2024+4.5% 5Y CAGR
Aug 27, 2026CONTRACTÄänekoski, Finland Valmet wins order for Metsä Group 3D Fiber packaging line in Äänekoski
Valmet announced an order from Metsä Group for a 3D Fiber molded fiber packaging line to be installed beside the Muoto demo plant in Äänekoski, Finland, with start-up planned for 2028. Contract value was not disclosed.
Capacity
over 100 million pieces per year (Muoto line, nominal)
Products3D Fiber molded fiber production linemolded fiber trays and food containers
“Valmet称,此次交付是其3D Fiber技术首次进入商业规模生产线应用。”wedoany.com
- 1 source
- wedoany.comValmet获Metsä Group 3D Fiber包装生产线订单 - 维度网Sep 1, 2026
Summarized from public sources; check the original articles before acting on it.