Loading…

Wärtsilä will supply two Wärtsilä 34SG gas engines with a combined output of 19 MW to expand the Borg El Arab power plant in Egypt, increasing its capacity by two-thirds. The order was placed in June 2019, with delivery in January 2020 and operational by end of 2020.
“The order with Wärtsilä was placed in June 2019. The engineering and equipment (EEQ) contract is for two Wärtsilä 34SG engines running on natural gas fuel.”wartsila.com
Summarized from public sources; check the original articles before acting on it.