Loading…
China Machinery Engineering Corporation signed a contract with Tajik Aluminum Company (TALCO) for the 300kt/a electrolytic aluminum production line technical renovation project in Tajikistan. The contract value is approximately USD 545 million, with a 24-month construction period split into two 12-month phases.
“于2019年4月15日,该公司与塔吉克斯坦共和国塔吉克铝业公司就塔吉克300kt/a电解铝生产线技改项目签署了合同。”beta.zhitongcaijing.com
Summarized from public sources; check the original articles before acting on it.