Loading…

Budimex transported a turbo-rotor from Brno to the Generation Plant Kraków for TAMEH Polska. The investment worth over PLN 300 million includes replacing coal boilers with gas boilers and a new 55 MWe turbo generator.
“Construction of a new turbine-set in a plant built in 1950s is a big technological and organizational challenge.”tameh.pl
Summarized from public sources; check the original articles before acting on it.