Loading…

TAMEH POLSKA signed a contract with Budimex S.A. for stage 2 of a gas power block project at Generation Plant Krakow, involving erection of a new 55 MWe steam turbo set and auxiliary facilities, to be completed by August 2019.
“TAMEH POLSKA sp. z o.o. signed a contract with Budimex S.A. for the implementation of stage 2 of the 'Erection of a gas power block fired with blast furnace gas and natural gas, of total electric power of 55MW'”tameh.pl
Summarized from public sources; check the original articles before acting on it.