Loading…

Cadagua in a joint venture with Ferrovial Agroman was selected by Canal de Isabel II to design and build the expansion of the El Plantio wastewater treatment plant in Majadahonda, Madrid. The contract is valued at EUR 21,702,340.
“La obra adjudicada, por valor de 21.702.340,32 Euros, consistirá en el Diseño y construcción de una nueva EDAR.”newsroom.ferrovial.com
Summarized from public sources; check the original articles before acting on it.