Loading…
Nava Nakorn Electricity Generating Co. (NNEG) has started construction of a 60-MW expansion phase at its power plant in the Nava Nakorn industrial zone, Thailand. The 3.105-billion-baht project is scheduled for commercial operation in 2020, increasing total capacity to 185 MW.
“The expansion phase was consistently progressing towards the construction stage.”ratch.co.th
Summarized from public sources; check the original articles before acting on it.