Loading…

PTT awarded a 38.5-billion-baht EPC contract for the Nong Fab LNG receiving terminal in Rayong, Thailand, to a joint venture of Saipem and CTCI Corporation. The terminal has a capacity of 7.5 million tonnes per year and is expected to be completed by 2022.
“PTT Plc, the national oil and gas firm, has awarded a 38.5-billion-baht contract for engineering, procurement and construction of the Nong Fab terminal to store liquefied natural gas (LNG).”bangkokpost.com
Summarized from public sources; check the original articles before acting on it.