Loading…

JFE Steel decided to install a new continuous caster at its West Japan Works (Kurashiki area) with a total investment of approximately JPY 40 billion. The caster will have an annual capacity of about 2 million tons and is scheduled to start operation in the second half of fiscal 2020.
“西日本製鉄所(倉敷地区)の連続鋳造機の新設を決定しました。総投資額は、約400億円です。”jfe-steel.co.jp
Summarized from public sources; check the original articles before acting on it.