Loading…

Aggreko fully commissioned a 7.4 MW diesel power facility at Hummingbird Resources' Yanfolila Gold Mine in Mali, under a seven-year contract. The facility will provide power to the process plant.
“Aggreko has fully commissioned the 7.4 MW diesel power facility on site to provide power to the process plant”share-talk.com
Summarized from public sources; check the original articles before acting on it.