Loading…
Ural Turbine Works (ROTEK holding) shipped equipment for the reconstruction of a PT-60 turbine at Grodno CHP-2 in Belarus, under a contract signed in January 2016 with Grodnoenergo. The turbine is planned to be commissioned in 2018.
“Уральский турбинный завод (холдинг РОТЕК) отгрузил оборудование для реконструкции турбины ПТ-60 Гродненской ТЭЦ-2.”ruscable.ru
Summarized from public sources; check the original articles before acting on it.