Loading…

Mitsubishi Hitachi Power Systems (MHPS) has received an order for a 350 MW natural gas-fired gas turbine combined cycle power generation system for the Lamma Power Station Extension in Hong Kong. The equipment will be supplied through Mitsubishi Corporation, with operations scheduled to begin in January 2022.
“Mitsubishi Hitachi Power Systems, Ltd. (MHPS) has received an order for a 350 MW natural gas-fired gas turbine combined cycle (GTCC) power generation system equipment for Lamma Power Station Extension – Unit 11.”powerprogress.com
Summarized from public sources; check the original articles before acting on it.