Loading…

DONG Energy signed a multi-million pound contract with Bladt Industries for 96 transition pieces for the Hornsea Project One offshore windfarm. 56 will be manufactured at the OSB facility in Teesside, UK, and 40 at Bladt's facility in Aalborg, Denmark.
“Multi-million pound contract signed today safeguards 200 jobs in Teesside.”orsted.co.uk
Summarized from public sources; check the original articles before acting on it.