Loading…
Siemens Gamesa and DONG Energy signed an agreement to supply 94 8-MW offshore turbines totalling 752 MW for the Borssele 1 and 2 wind farm in Dutch waters, including turbine maintenance. The nacelles will be assembled in Cuxhaven, Germany and the blades produced in Hull, England.
“Siemens Gamesa and DONG Energy have signed an agreement for the supply of 94 8-MW turbines (752 MW) at the Borssele 1 and 2 offshore wind power plant being developed in Dutch waters.”powermag.com
Summarized from public sources; check the original articles before acting on it.