Loading…

Valmet received an order worth about €40 million to supply a 75MW CYMIC CFB boiler for the Onahama biomass power plant in Iwaki City, Fukushima Prefecture, Japan. The boiler will be delivered in cooperation with JFE Engineering, the EPC contractor.
“The order, which is estimated to be about €40m, is the fifth one for Valmet's CFB boiler from Japanese market in the last 24 months.”nsenergybusiness.com
Summarized from public sources; check the original articles before acting on it.