Loading…

CTP Chemisch Thermische Prozesstechnik GmbH has signed a contract with Opterra, a CRH company, to supply two LD-SCR systems at the Karsdorf plant in Germany. Commissioning is scheduled for early 2019.
“CTP Chemisch Thermische Prozesstechnik GmbH, based in Graz, Austria, has signed a contract with Opterra, a CRH company, for the supply of two new LD-SCR systems at the Karsdorf plant, Germany.”cemnet.com
Summarized from public sources; check the original articles before acting on it.