Loading…
VA Tech Wabag Limited won a Rs 386 crore design, build and operate order from the Bangalore Water Supply and Sewerage Board for a 150 MLD sewage treatment plant at K&C Valley in Bengaluru. Wabag will operate and maintain the plant for 10 years after construction.
“VA Tech Wabag Limited won a Rs 386crore design, build and operate order from the Bangalore Water Supply and Sewerage Board (BWSSB) for a 150 MLD Sewage Treatment Plant (STP) at K&C Valley in Bengaluru.”timesofindia.indiatimes.com
Summarized from public sources; check the original articles before acting on it.