Loading…
BW Water secured a contract to provide a wastewater treatment and reclaim system for a semiconductor wafer fabrication facility in Gujarat, India, with flow rates exceeding 1600 cubic metres per hour.
“BW Water has secured a major contract to provide the wastewater treatment and reclaim system for a semiconductor wafer fabrication facility in Gujarat, India.”valve-world.net
Summarized from public sources; check the original articles before acting on it.