Loading…

Ferrotec opened a second factory in Kulim, Kedah, Malaysia, in a RM1 billion expansion. The Padang Meha plant adds nearly one million square feet of manufacturing space and is scheduled to increase production in Q1 2027, with full production targeted for Q2 2027. The expansion is expected to create over 1,000 jobs.
“Ferrotec has opened a second factory in Kulim, Kedah, in a RM1 billion expansion that the Malaysian Investment Development Authority expects to create more than 1,000 jobs.”my.ibtimes.com
Summarized from public sources; check the original articles before acting on it.