Loading…
GE Vernova is modernizing its Veresegyház facility in Hungary, including a 14.5 MW solar park with 40 MWh battery storage, new lean production lines, and plans to add over 80 professionals.
“Once fully operational, this integrated renewable energy system will allow almost 50% of the site’s current total annual electric energy consumption of 33 GWh to be covered by zero-emission, renewable energy.”gevernova.com
Summarized from public sources; check the original articles before acting on it.