Loading…
Lockheed Martin received a $153.9 million contract modification from the U.S. Navy for long lead-time materials and components for Lot 20 of the F-35 Joint Strike Fighter program. Work will be performed in Texas, California, Florida, New Hampshire, Maryland, the UK, and Italy.
“Lockheed Martin has drawn another $153.9 million from the U.S. Navy for long lead-time materials and components purchases, in preparation for future F-35 production.”americanmachinist.com
Summarized from public sources; check the original articles before acting on it.