Loading…
Tallgrass and Mitsubishi Power Americas announced the delivery location for the first two M501JAC gas turbines for Phase 1 of the Cheyenne Power Hub in southeast Wyoming. The turbines will provide approximately 1,150 MW of power, representing an investment exceeding $7 billion and creating over 100 long-term local jobs.
“This milestone reflects the strength of collaboration between Tallgrass and Mitsubishi Power to deliver reliable, scalable power where it’s needed most.”crweworld.com
Summarized from public sources; check the original articles before acting on it.