Loading…

Doosan Enerbility signed a contract with Korea Southern Power (KOSPO) to supply three 380 MW class gas turbines for the Hadong Combined Cycle Power Plant and Goyang Changneung Combined Heat and Power Plant in South Korea. Commercial operation is targeted for December 2029.
“Doosan Enerbility said on the 11th that it held a signing ceremony with Korea Southern Power (KOSPO) for the supply of three 380-megawatt (MW) class gas turbines.”biz.chosun.com
Summarized from public sources; check the original articles before acting on it.