Loading…

CG Semi Private Ltd inaugurated India's first pilot line for end-to-end chip assembly, packaging and testing at its OSAT facility in Sanand, Gujarat. The G1 facility has a peak capacity of 0.5 million units per day, with commercial production expected in 2026. A second facility with 14.5 million units per day capacity is scheduled for end of 2026.
“Today, a pilot line of CG Power is getting operational and very soon the first chip from this pilot line will be dedicated to the nation by Prime Minister Narendra Modi.”thehindubusinessline.com
Summarized from public sources; check the original articles before acting on it.