Loading…

RIR Power Electronics Limited has received fiscal support from the Government of Odisha for Phase 1 of its Silicon Carbide semiconductor manufacturing facility in Bhubaneswar. The total project cost is approximately ₹618 crore for both phases, with Phase 1 capex of ~₹65 crore and an eligible government subsidy of ~₹32 crore.
“The project, with a total cost of ~₹618 crore for both Phase 1 and Phase 2, aims to make Odisha a hub for high-power semiconductor manufacturing.”rirpowersemi.com
Summarized from public sources; check the original articles before acting on it.