Loading…

Statkraft Värme decided to supplement its new hot water boiler in Åmål with a 400 kW ORC turbine from Againity. The turbine will be delivered in July 2025 and is expected to generate approximately 930 MWh of electricity annually.
“Statkraft in Åmål decided to supplement its new hot water boiler with an ORC turbine with a maximum capacity of 400 kW.”bioenergyinternational.com
Summarized from public sources; check the original articles before acting on it.