Loading…
Amarinth, working with agent ISG, won a $500K order from KPO for six winterised API 610 OH2 pumps for water and caustic fluid transfer at the Karachaganak gas condensate field in Kazakhstan, with 40-week delivery.
Amarinth, through its regional agent ISG, won a $500,000 order from Karachaganak Petroleum Operating (KPO) for six API 610 OH2 pumps for water and caustic fluid transfer at the Karachaganak gas condensate field in Kazakhstan. Delivery is required within 40 weeks.