Loading…
Enea Elkogaz, a subsidiary of Enea S.A., signed a conditional contract with alk Enerji for the design, construction and commissioning of two 668 MWe gas-fired combined cycle power units in Poland, with a net EPC value of PLN 6,378 million and an LTSA value of USD 170.09 million. Commissioning is scheduled for March 2029 and June 2029.