Loading…
Durban Container Terminal Pier 1 has taken delivery of the first nine of 16 Liebherr rubber-tyre gantry cranes ordered. The RTGs will be assembled on-site with handover expected in May 2025. Transnet National Ports Authority invested R744 million (USD 4.12 million) in the 16 RTGs.
Transnet National Ports Authority has appointed Grindrod South Africa as preferred bidder to develop and operate a R285 million container-handling facility at the Port of Richards Bay, increasing capacity from 50,000 to 200,000 TEU per annum.