Loading…
GE successfully executed a Performance Improvement Package (PIP) upgrade on the third 6B gas turbine at Indorama Eleme Petrochemicals in Nigeria. The upgrade increased the turbine's output by 5.1 MW, more than doubling the expected 2.5 MW increase, bringing cumulative power increase on three turbines to over 10 MW.