Loading…
Salcon Engineering Berhad, a subsidiary of Salcon Berhad, was awarded a RM209.9 million contract by Pengurusan Aset Air Berhad (PAAB) for Package 3 of the Langat 2 water treatment plant project. The scope includes designing and building a residual conveyance and disposal system with a pipe conveyor. The project is expected to be completed in January 2025.
HSS Engineers Berhad and its associate SMHB Sdn Bhd accepted a letter of appointment from Pengurusan Aset Air Berhad to provide engineering services for a new water treatment plant and upgrading of water systems in Batu Pahat, Johor, for a 72-month contract worth RM11.6 million.