Loading…
A joint venture led by Implenia (60%) with Frutiger (40%) has been awarded a CHF 467 million contract by the Swiss Federal Roads Office (FEDRO) to build the main northern section (Lot 241) of the second tube of the Gotthard road tunnel. Construction is scheduled from 2022 to 2029.