Loading…
ACCIONA was awarded two contracts in Portugal for tertiary water treatment at the Vilamoura WWTP (Algarve) and Carvalhal WWTP (Mafra), totaling €6 million. The Vilamoura plant is expected operational by mid-2026.
Valmet will deliver solids measurements and a sludge dewatering optimizer to Águas do Tejo Atlântico's Alcântara wastewater treatment plant in Lisbon, Portugal. The order was placed by Tecnilab Portugal SA.