Loading…
CNPlus signed a contract with Dongguk SNC and SM E&C for transport and installation work on the Sinheung wind farm project. The contract is worth KRW 3.49 billion and runs until September 30, 2022.
CNPlus, along with Dongguk SNC and SM ENC, won a 3.49 billion KRW contract for the transportation and installation of the Sinheung Wind Power Plant. The contract was announced on October 1, 2021.