Siemens wins turnkey contract for Mirfa grid substation in Abu Dhabi
Siemens was awarded a turnkey contract by TRANSCO to supply, install and hand over a 400/220/33-kV high-voltage grid substation at Mirfa, Abu Dhabi, connecting the new Mirfa Power Plant to the grid.