Loading…
Blackhill Engineering won its first contract with VolkerStevin to fabricate large steel structures for the temporary and permanent works of the Thanckes Oil Fuel Depot Loading Facility Refuelling Jetty, part of a £43m Defence Infrastructure Organisation project. The contract includes 15 sacrificial casings up to 23 tonnes each.