S&TC wins KRW 21.65 billion air cooler supply contract from SECL/CB&I JV
S&TC signed a supply contract worth KRW 21.65 billion with the SECL/CB&I joint venture to supply air cooler heat exchangers. The contract period runs from 24 August 2018 to 23 September 2019.