Mota-Engil, through its African subsidiary, was awarded a €240 million contract by Black Mountain Mining (Vedanta subsidiary) for preparation, excavation and transport at the Gamsberg zinc mine in South Africa. Work is expected to start in April 2021 with a maximum duration of 96 months.
Suez has signed a contract worth about US$ 110 million to build a drinking water plant in Bita, Luanda, Angola. The plant will have a capacity of 260,000 cubic meters per day and is part of a consortium with Mota Engil and Soares da Costa.
The South African National Roads Agency Limited (Sanral) awarded a R1.65 billion contract to the Concor Mota-Engil joint venture to build the Msikaba bridge near Lusikisiki, South Africa. Construction is due to start in February 2019 and will last 33 months.