GEA will supply a two-stage ammonia refrigeration system and 32 air coolers for Magnavale's new £130m cold store in Easton, Lincolnshire, UK. The facility, due for completion in late 2024, will be 47m high with capacity for 101,000 pallets.
GEA is to supply a two-stage ammonia refrigeration system for a 47-meter high, 101,000-pallet cold store being built by Magnavale in East Lincolnshire, UK, with operation expected in Q4 2024.
Blue Cube Portable Cold Stores fulfilled an order for nine blast freezers from Rick Bestwick (part of Magnavale Group), with three units installed at Warrington and Scunthorpe facilities.
Blue Cube Portable Cold Stores fulfilled an order for nine portable blast freezers from Rick Bestwick (part of Magnavale Group), installing three at Warrington and Scunthorpe facilities and others at Chesterfield and Liverpool. The units are high-performance 28-pallet 62kW and 115kW models.
Blue Cube Portable Cold Stores has fulfilled an order for nine blast freezers from Rick Bestwick (part of Magnavale Group), installing three at Warrington and Scunthorpe facilities and others at Chesterfield, Liverpool, and Warrington sites.