Siemens' Dresser-Rand business sold its 100th reciprocating compressor, an order of 11 heavy oilfield separable compressors to a midstream operator for gas gathering in the Permian Basin, Texas.
Dresser-Rand, part of Siemens Power and Gas, secured orders to supply power generation equipment for CNOOC's Penglai 19-3 oil field and the Dongfang 13-2 gas field offshore China. The scope includes two SGT-A30 RB power trains for Penglai and three SGT-600 power trains for Dongfang.
Dresser-Rand, part of Siemens Power and Gas, received an order from BP to supply two DATUM compressor trains with Siemens electric motors for the Mad Dog 2 project in the deepwater Gulf of Mexico. Equipment ships in 2018 and production is expected to begin late 2021.
Dresser-Rand, part of Siemens Power and Gas, received an order from BP to supply two DATUM compressor trains with Siemens electric motors for the Mad Dog 2 floating production platform in the deepwater Gulf of Mexico. Equipment ships in 2018 and oil production is expected to begin late 2021.
Siemens, through its Dresser-Rand subsidiary, received an order from GS Engineering & Construction to supply two gas turbine-driven compressor trains and two gas turbine generator package sets for Oman's Liwa Plastics Industrial Complex. The plant is expected to become operational in 2019.
Siemens and its Dresser-Rand business will supply two gas turbine-driven compressor trains and two gas turbine generator packages for the Liwa Plastics Industries Complex's NGL extraction plant in Fahud, Oman. The order was placed by GS Engineering & Construction for Orpic, and operations are expected in 2019.
Siemens and its Dresser-Rand business will supply two gas turbine-driven compressor trains and two gas turbine generator packages for the Liwa Plastics Industrial Complex in Oman, ordered by GS Engineering & Construction for Orpic.
Siemens and its Dresser-Rand business will supply two gas turbine-driven compressor trains and two gas turbine generator packages for the Liwa Plastics Industrial Complex in Oman, ordered by GS Engineering & Construction for Orpic. The NGL extraction plant in Fahud is expected to start operations in 2019.
Dresser-Rand, part of Siemens, received orders to supply five gas turbine-driven compressor trains to Mexican developer Fermaca for pipeline stations in La Laguna, Coahuila and Villa de Reyes, San Luis Potosi.
Dresser-Rand, part of Siemens Power and Gas, received an order from Air Liquide Global E&C Solutions Hangzhou for an innovative compressor train for an air separation plant in China.
Siemens' Dresser-Rand business received an order from Belayim Petroleum Company (Petrobel) for three SGT-400 gas turbines and generators for the Zohr gas field off Egypt. The order value is in the double-digit million euros range.