SABIC, through its affiliate Jubail United Petrochemical Company, awarded a $700 million contract to Samsung Engineering for an ethylene oxide/ethylene glycol project at Jubail Industrial City, Saudi Arabia. The project includes a 700,000 tonnes/year mono ethylene glycol capacity and is to be completed in 2020.
Samsung Engineering contracted Mammoet to transport and install 49 modules for the construction of Jubail United Petrochemical Company's EO/EG plant in Saudi Arabia. The plant is expected to produce 700,000 metric tons per annum and be completed in 2020.
McDermott International was awarded a fixed lump sum EPC contract from Samsung Engineering Saudi Arabia for 23 CB&I storage tanks and modification of two existing tanks for the JUPC EO/EG Plant No. 3 in Jubail, Saudi Arabia.
Samsung Engineering disclosed a contract with Jubail United Petrochemical Company for the UNITED Ethylene Oxide/Ethylene Glycol III Project in Jubail, Saudi Arabia, valued at KRW 419.18 billion (approx. USD 392 million). The contract was signed on December 27, 2017.
SABIC's subsidiary Jubail United Petrochemical Co. awarded Samsung Engineering an EPC contract for a third ethylene glycol plant in Jubail, Saudi Arabia. The contract is valued at approximately SAR 3.3 billion, with construction expected to finish in Q4 2020 and trial operations in H1 2021.