Loading…
Korea Aerospace Industries (KAI) signed a contract with Triumph Aerostructures to supply new B767 Sec.48 and horizontal tail structures for 257.1 billion KRW. The contract runs from November 1, 2018 to December 31, 2028.
Ast (KOSDAQ: 067390) signed a KRW 39.68 billion contract with Triumph Aerostructures LLC to supply fuselage parts for Bombardier G7000 and G8000 aircraft.
AST (Aerospace Technology of Korea) signed a 675 billion won contract with Triumph Aerostructures to supply Embraer E2 aircraft parts through 2027.