Loading…
Siemens Mobility has secured an additional order from Austrian Federal Railways (ÖBB) for 30 Mireo trains, increasing their fleet to 100.
GE Vernova has been awarded a contract by ÖBB to supply and commission two 85 MW variable speed pumped storage turbines for the new Tauernmoos Pumped Hydro Storage Power Plant in Austria. GE Vernova will handle design, engineering, manufacturing, and commissioning.
Austrian Railways (ÖBB) signed a framework contract with Siemens for up to 200 Vectron locomotives, with a firm order for 30 MS locomotives. Delivery is to begin in summer 2018.