Loading…
Unico Mechanical Corp won a USD 28 million contract from the U.S. Bureau of Reclamation to replace two 156-inch butterfly valves and refurbish gates at the Blue Mesa Hydro Electric Powerplant in Colorado. Work is slated to start in December 2024 and finish in September 2028, with Adams Valves as design and fabrication partner.