Loading…
German grid operator Amprion awarded GE Vernova's Grid Solutions business a contract for twelve 400 kV power transformers totaling more than 5,000 MVA, to be built in Mönchengladbach. Delivery is planned from 2025 to 2027.
“Amprion GmbH, one of four transmission system operators (TSO) in Germany, has awarded GE Vernova's Grid Solutions business a contract for twelve 400 kV power transformers.”gevernova.com
Summarized from public sources; check the original articles before acting on it.