Loading…

Vallourec has secured a contract with Allseas to supply nearly 18,000 tonnes of subsea seamless premium carbon steel line pipes for the Búzios 10 offshore project, operated by Petrobras. The contract includes an optional scope of almost 5,000 tonnes. Production will be carried out at Vallourec's facility in Jeceaba, Brazil.
“Vallourec has announced that it has secured a major contract with Allseas to supply line pipes for Búzios 10 offshore project located at the Búzios field, operated by Petrobras.”worldpipelines.com
Summarized from public sources; check the original articles before acting on it.